Siron Dry Deluge Testing is the eminent partner in all services to keep your deluge system fully operational.
SIRON patented Dry Deluge Testing technology is unique and field proven globally. SIRON test fire protection systems utilises vapour instead of water. SIRON Dry Deluge Testing is the only method of detecting blockages and partial blockages to pipe work and nozzles, and also identifying damaged nozzles without testing systems with water. INCOS Engineering will deliver this service at your site anywhere in Australia. Free demonstrations at INCOS Engineering premises can be arranged for you locally or via video conference.
Dry Deluge Testing
The philosophy behind the SIRON Dry Deluge Test is to ensure that critical firefighting safety systems are maintained in a fully serviceable condition, ensuring a reliable and long service life for system pipe work and protected equipment. It is imperative to ensure the full functionality of these systems between the time frames when mandatory wet deluge testing must be carried out according to your country’s regulatory requirements and standards.
Deluge systems are classed as critical infrastructure and are a key component in case of a fire or explosion. These fire suppression systems are the primary means in containing a fire and are crucial in keeping escape routes safe for evacuation. By maintaining these fire safety systems, we can ensure that in the unlikely event of an emergency, the systems can keep your workers and production assets safe.
With regular Dry Deluge Testing, the full functionality of the firefighting systems will be enhanced, and the reliability of the protected plant improved. The dry deluge testing becomes part of the overall asset safety maintenance system. This is why we are proud to bring our field proven technology to the globe, having continually improved the technology and procedures since 2010.
The patented Dry Deluge Test from SIRON Fire Protection Services provides many advantages compared to the traditional method of utilising corrosive sea water.
- As large volumes of sea water are not utilised the testing is deemed to be safer for the systems and plant
- By comparison, Dry Deluge Testing is considerably less expensive than setting up and performing a full wet test
- Testing can be carried out in manageable segments allowing operations to continue uninterrupted
- The preparation time needed to set up and prepare for the Dry Deluge Test is considerably shorter then set up time for a full wet test
- When conducting a Dry Test, leaks in flow pipes can be identified with more precision
- Dry Deluge Testing forces out any residual trapped water left over by a wet test
- As no sea water is used during the test, process equipment is protected, and its overall life expectancy is increased
- As no water is used during the test, there is no need for the sump tanks to pump out overflowed systems
- Reduced salt scaling inside flow pipes and nozzles, leading to less solids in the system and thus, resulting in fewer blockages
- The Dry Deluge test reduces salt scaling and corrosion in flow pipes, this results in less solids being present and in turn results in fewer blockages
Currently around 20 major global operators in the energy industry have fully adopted our Dry Testing technology. A number of these have internalised our technology into their own company preventative maintenance standards. These major operating companies are from various energy industries namely: biomass fuel, wind energy, oil and gas, mineral fuel and the nuclear fuel industry. Operators in other major industries have also started to adopt our technology.
These industries include but are not limited to the vehicle manufacturing and vehicle transportation industry. As with the energy sector these clients are some of the major players in transportation. Our technology is also been successfully adopted to function in large high-rise buildings like hospitals and office blocks. These buildings typically have high ceiling water storage systems where the deluge is installed, our technology also brings various advantages to these assets also.
In order to test the full functionality of the deluge system our Dry Deluge Test utilizes pressurized vapor as opposed to sea water. In order to utilise the Dry Testing across the full production unit some specific criteria need to be met. The pressurised vapor needs to be sufficiently dense as well as being stable, with no environmental impact.
The flow of pressurized vapor needs to be of the correct pressure and consistency to allow for all the nozzles and pipe work across the entire deluge system to be tested and inspected. With our experience in conducting elaborate dry tests with numerous types of operational settings we have adopted a fully functioning set of workable parameters, and procedures to allow our system to adapt to every unique location with its own unique set of requirements.
Typically, a two-inch hose is connected from vapor generator to a tie-in point immediately downstream of the deluge valve. The hose is then connected via a check valve to the tie-in point of the deluge system that is to be tested. The check valve ensures that the deluge system is still fully operational during the Dry Deluge Test. The compressor then forces the vapor to flow into the system, downstream of the deluge valve, through the headers and the pipe work, ultimately exiting through the deluge nozzles.
Whilst flowing downstream any blockages from corrosion or particulate matter within the system are identified by the irregular spray patterns being emitted from the nozzles. Any anomalies found in the nozzle spray patterns are investigated by inspecting the nozzles and the upstream pipe work by utilizing a portable borescope. Damaged nozzles can similarly be quickly identified due to incorrectly orientated or wrongly directed spray patterns during the Dry Deluge Test.
Damaged nozzles occur regularly on onshore/offshore facilities and they can affect the operability of the nozzle in question, or even in worse cases can negatively affect the overall hydraulic balance of the deluge system. The nozzles can be inspected relatively easily, since the vapor allows our technicians to inspect from a close distance. When nozzles are too high up to be inspected visually, we utilize a micro drone with high resolution imagery to carry out the inspection. This type of inspection would be near impossible to achieve while a full wet test is been carried out.
Dry Deluge Testing is a method of testing that conforms to the NFPA regulations in relation to the testing of open fire fighting systems. Under the NFPA regulations and in certain circumstances open fire fighting systems are allowed to be tested using alternative methods.
NFPA 25 (2023) paragraph 11.3.10.1.1:
Where discharge from the system discharge devices would create a hazardous condition or conflict with local requirements, an approved alternate method
to achieve full flow conditions shall be permitted.
The discharge patterns from all of the open spray devices shall be observed (NFPA 25 (2023) paragraph 10.3.3.3.1 and similarly NFPA 25 (2023) paragraph 11.3.10.2.7.1):
- to ensure that patterns are not impeded by plugged discharge devices
- to ensure that discharge devices are correctly positioned
- and to ensure that obstructions do not prevent discharge patterns from covering surfaces to be protected.
Where obstructions occur, the piping and discharge devices shall be cleaned, and the system retested. Typical hazardous conditions are created when the test water contains salt, which could lead to unsafe or dangerous situations if sprayed on electrical equipment or equipment prone to corrosion.
A conflict of local requirements arises when for e.g. an atrium deluge system cannot be tested because of the damage to equipment, furniture and administration systems being employed within the facility. Here the Authority Having Jurisdiction (AHJ) can give permission to test solely with vapor instead of a full wet test.
The philosophy behind the Dry Deluge Test is that the wet side, up to one of the block valves of the deluge valve is tested wet, this is implemented to ensure proper pump performance and deluge valve activation. The rest of the system, from this block valve 100% downstream to the open nozzles are tested dry, with vapor. By implementing these two test methodologies, the system is fully tested to its maximum degree of readiness for operation.
First the pump performance, fire and gas detection, and deluge valve activation are tested wet, and the open part of the system is integrally tested dry with vapor. Utilising these two tests in combination will allow for a full system operational check that will allow for the system to be maintained and certified as fit for purpose, usually extending the periods between wet deluge testing with full approval by regulatory bodies.
Siron Dry Deluge Testing also meets the criteria set out by the following standards and regulations:
- NFPA 15 (2023) Chapters 6, 10, 12
- NFPA 25 (2023) Chapters 8, 10, 11, 13, 14
- FM Global Datasheets 2-81 (version 1-2023), chapters 2.3, 2.4, 2.5.1, 2.5.3, 2.9, 3.1, tables 2c, 7 and 12
- Norsok S-001-Technical Safety (version 2021), chapter 21.4.4
- European Commission – The Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations (2013)
- Water deluge systems: Testing and performance measurements – UK HSE Guidance Offshore Information Sheet No. 1/2010
- API Recommended Practice 14G Fourth Edition, April 2007 – Section 7.4 Deluge and Sprinkler Systems.